Mount Piper Power Station - Construction

Construction

The first generator (Unit 2) was completed in 1992, and the second (Unit 1) in 1993. Units 3 and 4, although planned, were not built. It was the last power station built by the Electricity Commission of New South Wales (a body since abolished). Much of the design work done was undertaken in-house by the Commission.

In 2009 Delta Electricity (the government owned enterprise that owns and manages the power station as a commercial entity) unofficially re-rated the units at Mount Piper from their original 660MW to 700MW.

In 2007 & early 2008 there was public talk of 'completing' the power station but using modern super-critical, dry-cooling tower, coal-fired units of up to 1000MW capacity which uses much less water from surrounding rivers..

On the 7th of April 2010 the New South Wales Department of Planning announced that approval had been given to Delta Electricity to 'complete' the station by installing 2000MW of new generating capacity.

Read more about this topic:  Mount Piper Power Station

Famous quotes containing the word construction:

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)