Mitcham Eastfields Railway Station - Design

Design

The station cost £6m, and was the second station to be built to a modular design developed by Network Rail, which is also used at Corby railway station and Greenhithe railway station which was the first to be constructed. The platforms are 170 m long, with a building on the up (northbound) platform. The platforms are arranged so that each is situated beyond the level crossing in the direction of travel, allowing the crossing to be reopened while trains are stopped at the station, minimising the disruption to road traffic. However this means that passengers must cross Eastfields Road (no controlled crossing at present) if they wish to purchase a ticket on the northbound side and then travel southbound. The footbridge on the southbound side only allows safe movement over the railway and not the road.

Read more about this topic:  Mitcham Eastfields Railway Station

Famous quotes containing the word design:

    I begin with a design for a hearse.
    For Christ’s sake not black—
    nor white either—and not polished!
    Let it be weathered—like a farm wagon—
    William Carlos Williams (1883–1963)

    If I knew for a certainty that a man was coming to my house with the conscious design of doing me good, I should run for my life ... for fear that I should get some of his good done to me,—some of its virus mingled with my blood.
    Henry David Thoreau (1817–1862)

    Nowadays the host does not admit you to his hearth, but has got the mason to build one for yourself somewhere in his alley, and hospitality is the art of keeping you at the greatest distance. There is as much secrecy about the cooking as if he had a design to poison you.
    Henry David Thoreau (1817–1862)