In 1948, McLouth Steel started its $100 million expansion program by purchasing riverfront property in Trenton, MI. Construction on the first major construction program was started soon afterward. The site was laid out and four sixty ton electric arc furnaces were installed. Soaking pits, a blooming mill, a Steckel mill, an down-coiler and finishing equipment were installed. McLouth was soon established as a growing factor in the marketplace. The first ingots were poured in 1949.

A few years later in 1954, the Trenton Plant was dedicated and McLouth Steel became able to produce iron as an integrated steel mill. Number One blast furnace was constructed with a capacity of 1250 tons a day. The three original 60 ton basic oxygen furnace (BOF) vessels were installed and McLouth became the first plant in North America to make steel via the basic oxygen process. Adding to the melt shop were two 200 ton electric arc furnaces. The reversing Steckel mill was replaced by a six stand continuous 60-inch (1,500 mm) hot strip rolling mill and a roughing stand was added to compliment the blooming mill. More soaking pits were installed as well as a plant to supply the BOP with oxygen. Two pickle lines were also added along with the slitters.

1958 saw another major expansion of the plant. A new blast furnace was constructed (Number 2), two 110 ton BOP vessels, and the related support equipment for the BOP and blast furnaces also had their capacity increased. Gas cleaning systems were installed for the melt shop as well. Two Rust slab reheat furnaces were installed to handle stainless steel, as well as the massive grinder and slab unpilers. The grinders, unpilers, and the pusher/bumper units for the two furnaces were supplied by Composite Forgings, Inc.

Between 1960 and 1964 one more 110 ton BOP vessel was added bringing the 110 ton vessel count to three. McLouth also became the first company to use computer controls on a hot strip mill on November 1, 1962. Significantly, the first "straight stick" slab caster was installed during this period. It was the first in the United States.

Profitable operations as well as market demand prompted a major commitment to build a Continuous Casting department in 1967 with the announcement of four curved mold continuous casting strands and six lines of three induction slab reheaters. Two additional 110 ton BOP vessels were also added to replace old and obsolete equipment (the 60 ton vessels). With these improvements to McLouth's steel making process, McLouth became the first steel mill to eventually produce 100% of its product by the continuous casting process, which added significantly to the efficiency of the operations and improved the quality of the finished product.

The plant was sold in 1996 to Detroit Steel Company. After several failed start-up attempts, the Trenton complex rots away. The plant's electric distribution infrastructure was ripped out in the summer of 2009. The main office is powered by diesel generator, while the rest of the plant is left without power.

As of October 1, 2011, Detroit Steel as the umbrella company for Trenton Land Holdings owes the Wayne County Treasurer $4,739,127.08 in past due taxes dating back to 2005.

The Blooming mill, rougher and finishing stands, as well as the reheat furnace are all for sale. The blooming mill is expected to bring in around $1 million, $3 million for the rougher and finishing mills, and around $5 million for the reheat furnace. This may or may not happen.