Master Card Center - Procurement Information

Procurement Information

  • Main building: construction materials, ventilation equipment, electrical equipment, water supply and drainage etc.
  • Sports field: special wooden sports flooring
  • Accessory equipment: stands seats, stand protection and lifting system, illumination, electronic displays, communication and broadcasting equipment, fire fighting equipment etc.
  • An Information Age building: network system equipment, network technical equipment, network solutions, security system, database technologies and products.
  • An Intelligent building: acoustical equipment, air conditioning, elevators, electronic monitoring, electronic fire-fighting systems, etc.
  • Outdoor engineering: garden, afforestation and square tiles etc.
  • Project Venue: The project is located at the intersection of the extended section of Chang'an Street and the West 4th Ring, adjacent to Wukesong Station on metro Line 1.
  • Construction Scale: The planned construction area is about 350,000 square meters.
  • Construction Schedule: Construction began in March 2005. The baseball field started in second half of the year 2005, completed in May 2007 and the stadium completed in August 2007.

Read more about this topic:  Master Card Center

Famous quotes containing the word information:

    As information technology restructures the work situation, it abstracts thought from action.
    Shoshana Zuboff (b. 1951)