List of International Space Station Spacewalks - 2003

2003

Mission
Spacewalkers
Start (UTC)
End (UTC)
Duration
50. Expedition 6
Kenneth Bowersox
Donald Pettit
January 15, 2003
12:50
January 15, 2003
19:41
6 hours, 51 minutes
Released the remaining launch locks on the P1 radiator assembly, removed debris on a sealing ring of Unity's docking port, and tested an ammonia reservoir on the station's P6 truss.
51. Expedition 6
Kenneth Bowersox
Donald Pettit
April 8, 2003
12:40
April 8, 2003
19:06
6 hours, 26 minutes
Reconfigured cables on the S0 (S-Zero), S1 and P1 trusses, replaced a Power Control Module on the Mobile Transporter, installed Spool Positioning Devices on Destiny, and reinstalled a thermal cover on an S1 Radiator Beam Valve Module.

Read more about this topic:  List Of International Space Station Spacewalks