2003
|
|
|
|
|
|
50. | Expedition 6 |
Kenneth Bowersox Donald Pettit |
January 15, 2003 12:50 |
January 15, 2003 19:41 |
6 hours, 51 minutes |
Released the remaining launch locks on the P1 radiator assembly, removed debris on a sealing ring of Unity's docking port, and tested an ammonia reservoir on the station's P6 truss. | |||||
51. | Expedition 6 |
Kenneth Bowersox Donald Pettit |
April 8, 2003 12:40 |
April 8, 2003 19:06 |
6 hours, 26 minutes |
Reconfigured cables on the S0 (S-Zero), S1 and P1 trusses, replaced a Power Control Module on the Mobile Transporter, installed Spool Positioning Devices on Destiny, and reinstalled a thermal cover on an S1 Radiator Beam Valve Module. |
Read more about this topic: List Of International Space Station Spacewalks