2001
|
|
|
|
|
||
14. | STS-98 † |
Thomas D. Jones Robert L. Curbeam |
February 10, 2001 15:50 |
February 10, 2001 23:24 |
7 hours, 34 minutes | |
Removed protective launch covers and disconnected power and cooling cables between Destiny and Atlantis, while crewmembers inside moved the 3,800-cubic-foot (110 m3) laboratory from the payload bay to its home on the Unity node. Curbeam and Jones then connected electrical, data and cooling lines to the lab, during which a small amount of ammonia crystals leaked from one of the hoses, prompting a decontamination procedure. | ||||||
15. | STS-98 † |
Thomas D. Jones Robert L. Curbeam |
February 12, 2001 15:59 |
February 12, 2001 22:49 |
6 hours, 50 minutes | |
Installed the shuttle docking adapter onto Destiny, installed insulating covers over the pins that held Destiny in place during launch, attached a vent to the lab's air system, installed handrails and sockets on the exterior of Destiny, and attached a base for the future space station robotic arm. | ||||||
16. | STS-98 † |
Thomas D. Jones Robert L. Curbeam |
February 14, 2001 14:48 |
February 14, 2001 20:13 |
5 hours, 25 minutes | |
Attached a spare communications antenna to the station, double-checked connections between the Destiny lab and its docking port, released a cooling radiator on the station, inspected solar array connections at the top of the station, and tested the ability of a spacewalker to carry an immobile crew member back to the shuttle airlock. This was the 100th U.S. spacewalk. | ||||||
17. | STS-102 † |
James S. Voss Susan J. Helms |
March 11, 2001 05:12 |
March 11, 2001 14:08 |
8 hours, 56 minutes | |
Prepared Pressurized Mating Adapter-3 for repositioning from Unity’s Earth-facing berth to the port-side berth to make room for Leonardo, the Italian Space Agency-built Multi-Purpose Logistics Module. Removed a Lab Cradle Assembly from the shuttle's cargo bay and installed it on the side of Destiny, and installed a cable tray to Destiny for later use by the station’s robot arm. After re-entering the shuttle's airlock, Voss and Helms remained ready to assist if any troubles installing the docking port were encountered by the crew inside the shuttle. Longest space walk in shuttle history. | ||||||
18. | STS-102 † |
Andrew S. W. Thomas Paul W. Richards |
March 13, 2001 05:23 |
March 13, 2001 11:44 |
6 hours, 21 minutes | |
Installed an External Stowage Platform for spare station parts, attached a spare ammonia coolant pump to the platform, finished connecting several cables put in place on the first EVA for the station's robotic arm. Inspected a Unity node heater connection, and inspected of an exterior experiment, the Floating Potential Probe. | ||||||
19. | STS-100 † |
Chris Hadfield Scott E. Parazynski |
April 22, 2001 11:45 |
April 22, 2001 18:55 |
7 hours, 10 minutes | |
Installed the station's UHF antenna, and the Canadian Space Agency made Canadarm2. Connected cables to give the arm power and allow it to accept computer commands from inside the lab. Hadfield became the first Canadian spacewalker. | ||||||
20. | STS-100 † |
Chris Hadfield Scott E. Parazynski |
April 24, 2001 12:34 |
April 24, 2001 20:14 |
7 hours, 40 minutes | |
Connected the Power Data Grapple Fixture circuits for Canadarm2 onto Destiny, removed an early communications antenna, transferred a spare Direct Current Switching Unit from the shuttle's payload bay to an equipment storage rack on the outside of Destiny. | ||||||
21. | Expedition 2 |
Yury Usachev James Voss |
June 8, 2001 14:21 |
June 8, 2001 14:40 |
0 hours, 19 minutes | |
Installed the docking cone onto the Zarya module, in preparation for the arrival of the Russian Pirs docking compartment. Only EVA to be conducted from the transfer compartment at the forward end of the Zvezda Service Module. | ||||||
22. | STS-104 † |
Michael L. Gernhardt James F. Reilly |
July 15, 2001 03:10 |
July 15, 2001 09:09 |
5 hours, 59 minutes | |
Installed the Quest Joint Airlock onto the Unity node. | ||||||
23. | STS-104 † |
Michael L. Gernhardt James F. Reilly |
July 18, 2001 03:04 |
July 18, 2001 09:33 |
6 hours, 29 minutes | |
Installed one of two high-pressure nitrogen tanks, and one of two high-pressure oxygen tanks onto Quest, and installed grapple fixture and trunnion covers. | ||||||
24. | STS-104 |
Michael L. Gernhardt James F. Reilly |
July 21, 2001 04:35 |
July 21, 2001 08:37 |
4 hours, 02 minutes | |
First EVA conducted from the Quest airlock. Installed the second high-pressure nitrogen tank, and the second oxygen tank onto the Quest airlock. | ||||||
25. | STS-105 † |
Daniel T. Barry Patrick G. Forrester |
August 16, 2001 13:58 |
August 16, 2001 20:14 |
6 hours, 16 minutes | |
Installed an Early Ammonia Servicer onto the station's P6 truss, co-location of the foot restraint in a stowed location, and installed the Materials International Space Station Experiment(MISSE)-1 and 2 containers onto the Quest airlock. | ||||||
26. | STS-105 † |
Daniel T. Barry Patrick G. Forrester |
August 18, 2001 13:42 |
August 18, 2001 19:11 |
5 hours, 29 minutes | |
Installed heater cables and handrails onto the station's Destiny laboratory. | ||||||
27. | Expedition 3 * |
Vladimir Dezhurov Mikhail Tyurin |
October 8, 2001 14:24 |
October 8, 2001 19:22 |
4 hours, 58 minutes | |
Installed cables between the Pirs, and the Zvezda module to allow spacewalk radio communications between the two sections. Installed handrails onto Pirs, and installed an exterior ladder to assist spacewalkers leaving Pirs. Installed a Strela cargo crane. | ||||||
28. | Expedition 3 * |
Vladimir Dezhurov Mikhail Tyurin |
October 15, 2001 09:17 |
October 15, 2001 15:08 |
5 hours, 51 minutes | |
Installed Russian commercial experiments (MPAC-SEEDS) onto the exterior of the Pirs docking compartment. | ||||||
29. | Expedition 3 * |
Vladimir Dezhurov Frank Culbertson |
November 12, 2001 21:41 |
November 13, 2001 02:46 |
5 hours, 05 minutes | |
Connected cables on the exterior of Pirs for the Kurs automated docking system, completed checks of the Strela cargo crane, and inspected and photographed a panel of a solar array on Zvezda that had a portion of a panel not fully unfolded. | ||||||
30. | Expedition 3 * |
Vladimir Dezhurov Mikhail Tyurin |
December 3, 2001 13:20 |
December 3, 2001 16:06 |
2 hours, 46 minutes | |
Removed an obstruction that prevented a Progress resupply ship from firmly docking with the station, and took pictures of the debris and of the docking interface. | ||||||
31. | STS-108 † |
Linda M. Godwin Daniel M. Tani |
December 10, 2001 17:52 |
December 10, 2001 22:04 |
4 hours, 12 minutes | |
Installed insulating blankets around two Beta Gimbal Assemblies that rotate the station's solar array wings, and performed get-ahead tasks in preparation for STS-110's spacewalks. |
Read more about this topic: List Of International Space Station Spacewalks