Three-phase Systems
Voltage | Current | Contact system | Name of system | Location | Country | Notes |
---|---|---|---|---|---|---|
three wire | Tagebau Gruhlwerk | rack railway (0.7 km) operated 1927–1949 |
||||
725 | 50 Hz, Δ | two wire | Gornergratbahn | Zermatt | Switzerland | Website |
750 | 40 Hz, 3Ø | two wire | Burgdorf-Thun Bahn | Burgdorf – Thun | Operated 1899–1933 converted to 15 kV 16⅔ Hz in 1933 |
|
800 | 60 Hz, 3Ø | Corcovado Rack Railway | Rio de Janeiro | Brazil | ||
1125 | 50 Hz, 3Ø | two wire | Jungfraubahn | Interlaken | Switzerland | Website |
3000 | 15 Hz, 3Ø | Valtellina Electrification | Northern Italy | 1902–1917 | ||
50 Hz, 3Ø | Chemin de Fer de la Rhune | France | ||||
3000 | 16 Hz, 3Ø | two wire | Simplon Tunnel | Switzerland, Italy; | Simplon Bahn, 1906–1930 | |
3600 | 16⅔ Hz, 3Ø | two wire | Italy | operated 1912–1976 in Upper Italy (more info needed) | ||
FS | Porrettana railway | 1927–1935 | ||||
5200 | 25 Hz, 3Ø | Almeria – Gergal | Spain | 1911–1966? | ||
10 kV | 45 Hz, 3Ø | two wire | FS | Roma - Sulmona | Italy | 1929–1944 |
50 Hz, 3Ø | three wire | Berlin - Lichtenhain | Germany | test track (1.8 km). variable voltage and frequency. Ttrial runs 1898–1901 |
||
14 kV (See notes) |
38 Hz - 48 Hz (See notes) |
three wire | Zossen - Marienfelde | test track (23.4 km). trial runs 1901–1904 variable voltage between 10 kV and 14 kV and frequency between 38 Hz and 48 Hz. |
Read more about this topic: List Of Current Systems For Electric Rail Traction
Famous quotes containing the word systems:
“Before anything else, we need a new age of Enlightenment. Our present political systems must relinquish their claims on truth, justice and freedom and have to replace them with the search for truth, justice, freedom and reason.”
—Friedrich Dürrenmatt (19211990)