- May 2005 - The NTTA Board of Directors selected a preliminary design of the bridge, which features a distinctive tied arch spanning 360 feet (110 m) at the center with approaches and thresholds flanked by pairs of lighted columns.
- Late 2005 - A Finding of No Significant Impact (FONSI) for the Environmental Impact Assessment is received
- Early 2006 - Completion of plans, specifications and estimates on the toll bridge and public hearings for sections 4-6 and 8. Design for sections 4-6 initiated.
- Spring 2006 - Denton County broke ground on Section 1, west of the bridge, and construction is under way.
- Summer 2006 - Construction on Section 3, the eastern approach to the bridge, is planned to begin in late summer 2006.
- January 2007 - Groundbreaking for the bridge was held in Denton County on January 31, 2007
- May 2007 - Crews have built and placed many of the rebar frames for the support columns on the west bank and will soon begin pouring concrete into them.
- May 2008 - Construction of the bridge reached the halfway point.
- January 2009 - All four corner pieces of the arch structure are in place.
- April 2009 - The last major rib arch piece was installed. Construction is approximately 90% complete.
- August 1, 2009 - Charity run and walk across bridge. Bridge opens to vehicular traffic.
- February 28, 2010 - Last portions of the construction work are completed, including work on the arch lighting.
Read more about this topic: Lewisville Lake Toll Bridge
Famous quotes containing the words key and/or dates:
“Power, in Cases world, meant corporate power. The zaibatsus, the multinationals ..., had ... attained a kind of immortality. You couldnt kill a zaibatsu by assassinating a dozen key executives; there were others waiting to step up the ladder; assume the vacated position, access the vast banks of corporate memory.”
—William Gibson (b. 1948)
“Nothing so dates a man as to decry the younger generation.”
—Adlai Stevenson (19001965)