Kisei Main Line - Basic Data

Basic Data

  • Operators, distances:
    • Total: 384.2 km
    • Central Japan Railway Company (category 1)
      • Kameyama - Shingū: 180.2 km
    • West Japan Railway Company (category 1)
      • Shingū - Wakayamashi: 204.0 km
    • Japan Freight Railway Company (category 2)
      • Kameyama - Shingū: 180.2 km
      • Shingū - Kii-Sano: 6.4 km
  • Track
    • Double: Kii-Tanabe - Wakayama
    • Single: the remainder
  • Traction
    • Kameyama - Shingū: internal combustion
    • Shingū - Wakayama - Wakayamashi: Electrified 1,500 V DC
  • Railway signalling:
    • Kameyama - Shingū: Special Automatic (ja:閉塞方式#特殊自動閉塞式), a simplified automatic system
    • Shingū - Wakayama: Automatic
  • Centralized traffic control (CTC) center:
    • Kameyama - Shingū: Tōkai Operation Control Center
    • Shingū - Wakayamashi: Tennōji Operation Control Center

Read more about this topic:  Kisei Main Line

Famous quotes containing the words basic and/or data:

    Not many appreciate the ultimate power and potential usefulness of basic knowledge accumulated by obscure, unseen investigators who, in a lifetime of intensive study, may never see any practical use for their findings but who go on seeking answers to the unknown without thought of financial or practical gain.
    Eugenie Clark (b. 1922)

    This city is neither a jungle nor the moon.... In long shot: a cosmic smudge, a conglomerate of bleeding energies. Close up, it is a fairly legible printed circuit, a transistorized labyrinth of beastly tracks, a data bank for asthmatic voice-prints.
    Susan Sontag (b. 1933)