Kingston High School (Washington) - Facility

Facility

The school opened in 2007 in a new 113,000 square foot facility organized around four internal learning neighborhoods. Architects for the project were Bassetti Architects of Seattle.

In 2011 a 47 kW photovoltaic solar panel system was installed on the roof of the school. The panels were installed by a private sector company which rents the rooftop space from, and sells the electricity generated to, the school district at the same rate as is currently being charged by the utility company. After 10 years, ownership of the panels and the electricity generated is to be transferred to the school district.

Read more about this topic:  Kingston High School (Washington)

Famous quotes containing the word facility:

    The three great ends which a statesman ought to propose to himself in the government of a nation, are,—1. Security to possessors; 2. Facility to acquirers; and, 3. Hope to all.
    Samuel Taylor Coleridge (1772–1834)

    Probability but no truth, facility but no freedom—it is owing to these two fruits that the tree of knowledge cannot be confused with the tree of life.
    Friedrich Nietzsche (1844–1900)

    In progress of time, when my mind was, as it were, strongly impregnated with the Johnsonian æther, I could, with much more facility and exactness, carry in my memory and commit to paper the exuberant variety of his wit and wisdom.
    James Boswell (1740–1795)