The Kaohsiung City Government undertook a feasibility study to construct a rapid transit system in Kaohsiung in 1987. After finding favorable results, the city government began lobbying the Central Government for approval and funding. In 1990 approval was obtained to establish the Kaohsiung City Mass Rapid Transit Bureau and planning of the rapid transit network started. The first phase of the Kaohsiung Mass Rapid Transit System, the Red and Orange Lines, was approved in 1991, but disputes in funding shares between Kaohsiung City and Kaohsiung County Governments stalled the project. The Kaohsiung City Mass Rapid Transit Bureau was officially established in 1994, to coincide with the project's move into the final scoping and detail design stages.

Work continued until 1996, when the Central Government ordered KMRT to look into constructing the project via the Build-Operate-Transfer (BOT) method. In 1999 the city government put out a request for the BOT contract to construct the first phase of the KMRT system. In 2000, out of the three consortia that submitted bids, Kaohsiung Rapid Transit Corporation (KRTC) was awarded the contract received priority negotiating rights with the city government in constructing the system. KRTC obtained a company license and was registered in December 2000. In January 2001, KRTC signed the "Construction and Operation Agreement" and the "Development Agreement" with the Kaohsiung City Government, signaling the beginning of construction of the KMRT system. The main participants of the KRTC are: China Steel Corporation, Southeast Cement Corporation, RSEA Engineering Corporation, China Development Industrial Bank, and the Industrial Bank of Taiwan. The currently system cost NT$181.3 (US$5.46 billion) to construct and includes a contract for 30 years of operation and maintenance. Construction costs were shared between the central government (79%), Kaohsiung City Government (19%), and Kaohsiung County Government (2%).

Construction began in October 2001, with 66 shield tunnels (45.3 km) completed in May 2006. The cut-and-cover and bored tunnel methods were used for construction of the lines. In November 2006, the first trial runs began on the Red Line. In January 2007, the last concrete slabs were laid for the 37 planned stations.

Read more about this topic:  Kaohsiung Mass Rapid Transit

Famous quotes containing the word history:

    As History stands, it is a sort of Chinese Play, without end and without lesson.
    Henry Brooks Adams (1838–1918)

    Hence poetry is something more philosophic and of graver import than history, since its statements are rather of the nature of universals, whereas those of history are singulars.
    Aristotle (384–322 B.C.)