Harnessing hydropower on the Jinping bend of the Yalong River has been in planning for decades. The length of bend is 150 km but the downstream part of the river on the opposite side is only separated by 16 km. Between that distance, there is an elevation drop of 310 m, creating an excellent situation for hydroelectricity production. Two projects were planned for the bend, the Jinping I and Jinping II with a combined capacity of 8,400 MW. Planning for the projects began in the 1960s under the former Sichuan and Shanghai design institutes along with the Ministry of Water Resources and Electric Power. They produced the "Reinvestigation Report on The Yalong River bend (Jinping)". In July 1965, the Jinping Hydropower Engineering Headquarters was set up and designs for the Jinping 1 and Jinping 2 would progress with the East China Investigation and Design Instititute .

Construction on the Jinping 2 started on January 30, 2007 and is scheduled to be completed in 2014.

Read more about this topic:  Jinping-II Hydropower Station

Famous quotes containing the word history:

    The history of all hitherto existing society is the history of class struggles.
    Karl Marx (1818–1883)

    The history of all previous societies has been the history of class struggles.
    Karl Marx (1818–1883)

    Racism is an ism to which everyone in the world today is exposed; for or against, we must take sides. And the history of the future will differ according to the decision which we make.
    Ruth Benedict (1887–1948)