Future
California State Route 15 from Interstate 5 to Interstate 8 in San Diego will be re-designated as part of I-15 once this segment is completely upgraded to Interstate standards.
Most of Interstate 15 is undergoing major improvements from Devore to the Nevada State Line, beginning in 2002 and costing $349 million. This project will improve traffic flow on the heavily traveled highway for those going to and from Las Vegas. Most of the construction was completed by winter 2009. Projects include adding truck lanes on hills (39 miles or 63 kilometres at various locations), repaving 76 miles (122 km) of I-15 at various locations, adding exit numbers, renovating and rehabilitating the rest area between Baker and the Nevada State Line (Valley Wells Rest Area), reconstructing bridges in Baker, and moving the agriculture inspection station from Yermo to the Nevada State Line and including a truck weigh station.
As of March 2008, construction is underway to add a northbound truck descending lane and to repave lanes between Bailey Road and Yates Well Road.
Read more about this topic: Interstate 15 In California
Famous quotes containing the word future:
“As the mother of a son, I do not accept that alienation from me is necessary for his discovery of himself. As a woman, I will not cooperate in demeaning womanly things so that he can be proud to be a man. I like to think the women in my sons future are counting on me.”
—Letty Cottin Pogrebin (20th century)
“I am succeeding quite well in my work and the future looks well. What special mission is God preparing me for? Cutting off all earthly ties and isolating me as it were.”
—Ellen Henrietta Swallow Richards (18421911)
“We live in an age when to be young and to be indifferent can be no longer synonymous. We must prepare for the coming hour. The claims of the Future are represented by suffering millions; and the Youth of a Nation are the trustees of Posterity.”
—Benjamin Disraeli (18041881)