Hearn Generating Station - History

History

The R. L. Hearn Generating Station was the site of Canada's first 100 MW steam turbo-generator set. The station was officially opened on October 26, 1951 by Leslie Frost, Premier of Ontario, with the first two units in service. Four units were in operation by 1953. The plant originally burned coal which was transported on ships through the Saint Lawrence Seaway. The station was designed by Stone & Webster. The turbine generators were built by Parsons in England and the boilers were made in Canada by Babcock & Wilcox (Cambridge, Ontario) and Combustion Engineering (Montreal, Quebec).

Construction on the station was not even finished in the 1950s when Hydro officials and the government began to talk about phasing out the plant with nuclear power and closing it. The early years were marked by difficult labour relations and several near strikes. Several unions were involved in conflicts with management and each other during the life of the station. The R. L. Hearn station was one of the founding locals of the Canadian Union of Operating Engineers and General Workers (CUOE Local 100) in 1960.

Read more about this topic:  Hearn Generating Station

Famous quotes containing the word history:

    Revolutions are the periods of history when individuals count most.
    Norman Mailer (b. 1923)

    What you don’t understand is that it is possible to be an atheist, it is possible not to know if God exists or why He should, and yet to believe that man does not live in a state of nature but in history, and that history as we know it now began with Christ, it was founded by Him on the Gospels.
    Boris Pasternak (1890–1960)

    Spain is an overflow of sombreness ... a strong and threatening tide of history meets you at the frontier.
    Wyndham Lewis (1882–1957)