Hazel Grove (Midland) Railway Station - Construction and Location

Construction and Location

The Midland Railway (MR) opened the station on its "Disley cut off" line (correct name: the New Mills and Heaton Mersey Line). This line was completed in 1902, to improve access of the MRs fast trains from London St Pancras via Derby to Manchester Central. The station was located 800 yards (730 m) south of Hazel Grove's centre, at the point where the line crossed over the Macclesfield and Buxton roads by means of two over-bridges, that are still in use. There was a siding on the Up line towards New Mills for goods trains to recess into by reversing in off the main line. There was also a pair of sidings adjacent to the Down line and the station. These two sidings were also accessed by reversing back into them at the Cheadle Heath end. Nothing remains of the station platform or subway and only the footpath leading up from Buxton Road remains with original slatted wooden Midland Railway style fencing and gates. Hazel Grove (Midland) signalbox was located at the New Mills end of the station and lasted until closure in the late 1970s when removed.

Read more about this topic:  Hazel Grove (Midland) Railway Station

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)