Hakodate Main Line - Basic Data

Basic Data

  • Operators
    • Hokkaido Railway Company (Category 1)
      • Hakodate - Ōnuma-Kōen - Otaru - Asahikawa: 423.1 km
      • Ōnuma - Oshima-Sawara - Mori, "Sawara Line": 35.3 km
      • Nanae - Ōnuma, "Fujishiro Line": Used by down (northbound) trains only
        Officially not recognized as a separate line
    • Japan Freight Railway Company ((Category 2))
      • Goryōkaku - Oshamambe: 108.9 km
      • Naebo - Asahikawa: 134.6 km
      • Ōnuma - Oshima-Sawara - Mori: 35.3 km
  • Gauge: 1,067 mm
  • Tracks:
    • Quadruple: Sapporo - Shiroishi
      Double for Hakodate Main Line, double for Chitose Line trains
    • Triple: Sōen - Sapporo
      Double for Hakodate Main Line, single for Sasshō Line trains
    • Double:
      • Hakodate - Nanae
      • Mori - Washinosu
      • Yamazaki - Kuroiwa
      • Kita-Toyotsu - Oshamambe
      • Otaru - Sōen
      • Shiroishi - Asahikawa
  • Electric supply:
    • 20,000 V AC:
      • Hakodate - Goryōkaku
      • Otaru - Asahikawa
    • Other sections are not electrified.
  • Railway signalling:
    • Oshamambe - Otaru: Special Automatic (Electronic Signal Verification); a simplified automatic system
    • Other sections: Automatic
  • Maximum speed at service: 130 km/h

Read more about this topic:  Hakodate Main Line

Famous quotes containing the words basic and/or data:

    The basic thing nobody asks is why do people take drugs of any sort?... Why do we have these accessories to normal living to live? I mean, is there something wrong with society that’s making us so pressurized, that we cannot live without guarding ourselves against it?
    John Lennon (1940–1980)

    To write it, it took three months; to conceive it three minutes; to collect the data in it—all my life.
    F. Scott Fitzgerald (1896–1940)