Hakodate Main Line - Basic Data

Basic Data

  • Operators
    • Hokkaido Railway Company (Category 1)
      • Hakodate - Ōnuma-Kōen - Otaru - Asahikawa: 423.1 km
      • Ōnuma - Oshima-Sawara - Mori, "Sawara Line": 35.3 km
      • Nanae - Ōnuma, "Fujishiro Line": Used by down (northbound) trains only
        Officially not recognized as a separate line
    • Japan Freight Railway Company ((Category 2))
      • Goryōkaku - Oshamambe: 108.9 km
      • Naebo - Asahikawa: 134.6 km
      • Ōnuma - Oshima-Sawara - Mori: 35.3 km
  • Gauge: 1,067 mm
  • Tracks:
    • Quadruple: Sapporo - Shiroishi
      Double for Hakodate Main Line, double for Chitose Line trains
    • Triple: Sōen - Sapporo
      Double for Hakodate Main Line, single for Sasshō Line trains
    • Double:
      • Hakodate - Nanae
      • Mori - Washinosu
      • Yamazaki - Kuroiwa
      • Kita-Toyotsu - Oshamambe
      • Otaru - Sōen
      • Shiroishi - Asahikawa
  • Electric supply:
    • 20,000 V AC:
      • Hakodate - Goryōkaku
      • Otaru - Asahikawa
    • Other sections are not electrified.
  • Railway signalling:
    • Oshamambe - Otaru: Special Automatic (Electronic Signal Verification); a simplified automatic system
    • Other sections: Automatic
  • Maximum speed at service: 130 km/h

Read more about this topic:  Hakodate Main Line

Famous quotes containing the words basic and/or data:

    “Justice begins with the recognition of the necessity of sharing. The oldest law is that which regulates it, and this is still the most important law today and, as such, has remained the basic concern of all movements which have at heart the community of human activities and of human existence in general.”
    —Elias Canetti (b. 1905)

    “This city is neither a jungle nor the moon.... In long shot: a cosmic smudge, a conglomerate of bleeding energies. Close up, it is a fairly legible printed circuit, a transistorized labyrinth of beastly tracks, a data bank for asthmatic voice-prints.”
    —Susan Sontag (b. 1933)