Basic Data
- Operators
- Hokkaido Railway Company (Category 1)
- Hakodate - Ōnuma-Kōen - Otaru - Asahikawa: 423.1 km
- Ōnuma - Oshima-Sawara - Mori, "Sawara Line": 35.3 km
- Nanae - Ōnuma, "Fujishiro Line": Used by down (northbound) trains only
- Officially not recognized as a separate line
- Japan Freight Railway Company ((Category 2))
- Goryōkaku - Oshamambe: 108.9 km
- Naebo - Asahikawa: 134.6 km
- Ōnuma - Oshima-Sawara - Mori: 35.3 km
- Hokkaido Railway Company (Category 1)
- Gauge: 1,067 mm
- Tracks:
- Quadruple: Sapporo - Shiroishi
- Double for Hakodate Main Line, double for Chitose Line trains
- Triple: Sōen - Sapporo
- Double for Hakodate Main Line, single for Sasshō Line trains
- Double:
- Hakodate - Nanae
- Mori - Washinosu
- Yamazaki - Kuroiwa
- Kita-Toyotsu - Oshamambe
- Otaru - Sōen
- Shiroishi - Asahikawa
- Quadruple: Sapporo - Shiroishi
- Electric supply:
- 20,000 V AC:
- Hakodate - Goryōkaku
- Otaru - Asahikawa
- Other sections are not electrified.
- 20,000 V AC:
- Railway signalling:
- Oshamambe - Otaru: Special Automatic (Electronic Signal Verification); a simplified automatic system
- Other sections: Automatic
- Maximum speed at service: 130 km/h
Read more about this topic: Hakodate Main Line
Famous quotes containing the words basic and/or data:
“The basic thing nobody asks is why do people take drugs of any sort?... Why do we have these accessories to normal living to live? I mean, is there something wrong with society thats making us so pressurized, that we cannot live without guarding ourselves against it?”
—John Lennon (19401980)
“To write it, it took three months; to conceive it three minutes; to collect the data in itall my life.”
—F. Scott Fitzgerald (18961940)