As the city's last remaining landfill site, Keele Valley, neared capacity during the 1990s, it was found that no other municipality in Southern Ontario was willing to accept the garbage, but there was also no political support for a change to incineration. A deal was eventually made to ship Toronto's garbage to the Adams Mine, an abandoned open pit mine in Northern Ontario, once the Keele Valley site closed. But objections grew into vociferous controversy as the time neared, and eventually the agreement was canceled.

By the time the Keele Valley site closed at the end of 2002, the city had made a new deal, to ship its garbage by truck to a site in Michigan (See Carleton Farms Landfill).

Concerns with the border, and opposition from residents in Michigan prompted the need to look for alternate sites or expand the city's recycling programs. The Michigan contract survived a vote in February 2006 by the Michigan House of Representatives to ban out-of-state garbage from being shipped to the state from Ontario and other U.S. states, as it also required approval by the US federal government before it could be enforced by Michigan. In May 2006, the Michigan Carleton Farms garbage dump under contract with the city of Toronto announced it would not be accepting waste sludge as of August 1, 2006, but would continue to receive household waste.

In September 2006, Toronto City Council agreed to purchase the privately owned Green Lane landfill site near St. Thomas, Ontario. Councillors opposed to the agreement accused Mayor Miller of pushing through a secretive deal and there was also a strong reaction from residents and MPs from the London-St. Thomas area. Jane Pitfield who ran (and lost) against Mayor Miller in the November 2006 election advocated incineration as an alternative method of disposing of waste, a position opposed by many Toronto environmental groups but supported by others arguing that the technology has improved and incineration is now less polluting.

Even with 60% diversion through the green bin and recycling programs, residual waste from the Greater Toronto Area would amass 2,200 tonnes (2,425 tons) a day or 800,000 tonnes (882,000 tons) a year.

In April 2007, the city signed contracts with First Nations bands whose reserves were close to the proposed landfill, which would entitle the bands to $4.27 per tonne of garbage deposited at the landfill, or approximately $500,000 per year.

The contract to ship household garbage to Michigan ended in 2010, at which point use of the Green Lane landfill began.

Size and capacity

Total Site Area: 129.7 hectares (320 acres) – surrounded by largely rural agricultural land.

- Disposal Area: 71.2 hectares (176 acres) is presently approved for landfilling.

- Additional Lands: approximately 486 hectares (1,200 acres) - essentially 21 parcels of farmland.

- Available Site capacity: as of April 2, 2007, approximately 15 million cubic metres of waste/daily cover = approximately 13.8 million tonnes of non-hazardous solid waste.

Under the current Waste Management Strategy at the City of Toronto the Landfill's life expectancy is as follows:

- at 42% waste diversion = estimated 17 years

- at 50-55% = estimated 19 to 21 years

- at 70% = estimated 28 years

Read more about this topic:  Green Lane Landfill

Famous quotes containing the words history and/or politics:

    All history becomes subjective; in other words there is properly no history, only biography.
    Ralph Waldo Emerson (1803–1882)

    Our democracy, our culture, our whole way of life is a spectacular triumph of the blah. Why not have a political convention without politics to nominate a leader who’s out in front of nobody?... Maybe our national mindlessness is the very thing that keeps us from turning into one of those smelly European countries full of pseudo-reds and crypto-fascists and greens who dress like forest elves.
    —P.J. (Patrick Jake)