Timing of FMEA
The FMEA should be updated whenever:
- A new cycle begins (new product/process)
- Changes are made to the operating conditions
- A change is made in the design
- New regulations are instituted
- Customer feedback indicates a problem
Read more about this topic: Failure Mode And Effects Analysis
Famous quotes containing the word timing:
“Is it a new spring star
Within the timing chill,
Talking, or just a mime,
That rises in the blood
Thin Jack-and-Jilling seas
Without the human will?”
—Allen Tate (18991979)