Extra-vehicular Activity
See also: List of spacewalks and moonwalks, List of ISS spacewalks, and Extra-vehicular activityMission | Spacewalkers | Start (UTC) | End (UTC) | Duration | ||
---|---|---|---|---|---|---|
Peggy Whitson Yuri Malenchenko |
9 November 2007 09:54 |
9 November, 16:49 |
6 hours, 55 minutes | |||
SSPTS cable disconnect and stowage, PMA-2 umbilical stowage, Node 2 avionics umbilical temp stowed. | ||||||
Whitson Daniel M. Tani |
20 November 2007 10:10 |
20 November, 17:26 |
7 hours, 16 minutes | |||
External configuration of PMA-2 and Harmony: Fluid, electrical, and data line hookups, avionics line hookup, heater cable hookups, Fluid tray relocation. | ||||||
Whitson Tani |
24 November 2007 09:50 |
24 November, 16:54 |
7 hours, 04 minutes | |||
Completion of fluid, electrical, and data line hookups for PMA-2 and Harmony. Loop B Fluid Tray connection to port side of Destiny. Photographic analysis of starboard Solar Alpha Rotary Joint (SARJ) to assist with troubleshooting on the ground, re-installation of CETA cart from a temporary stowage location. | ||||||
Whitson Tani |
18 December 2007 09:50 |
18 December, 16:46 |
6 hours, 56 minutes | |||
Inspection of the S4 starboard Solar Alpha Rotary Joint (SARJ), and a Beta Gimbal Assembly (BGA). The EVA is the 100th in support of building the International Space Station. | ||||||
Whitson Tani |
30 January 2008 09:56 |
30 January, 17:06 |
7 hours, 10 minutes | |||
Replacement of a Bearing Motor Roll Ring Module (BMRRM) in the S4 starboard Beta Gimbal Assembly (BGA), further inspection of the Solar Alpha Rotary Joint (SARJ). | ||||||
Read more about this topic: Expedition 16
Famous quotes containing the word activity:
“Every time a child organizes and completes a chore, spends some time alone without feeling lonely, loses herself in play for an hour, or refuses to go along with her peers in some activity she feels is wrong, she will be building meaning and a sense of worth for herself and harmony in her family.”
—Barbara Coloroso (20th century)