E5 Series Shinkansen - Operations

Operations

E5 series trainsets were first introduced on the new Hayabusa services between Tokyo and Shin-Aomori from 5 March 2011, initially operating at a maximum speed of 300 km/h. From 19 November 2011, a total of six E5 series trainsets were in operation, with sets also used on some Hayate and Yamabiko services. Hayate services operate coupled with E3 series Komachi services, and are limited to a maximum speed of 275 km/h. From the start of the revised timetable on 17 March 2012, E5 series sets were also introduced used on some Nasuno all-stations services.

Read more about this topic:  E5 Series Shinkansen

Famous quotes containing the word operations:

    You can’t have operations without screams. Pain and the knife—they’re inseparable.
    —Jean Scott Rogers. Robert Day. Mr. Blount (Frank Pettingell)

    Plot, rules, nor even poetry, are not half so great beauties in tragedy or comedy as a just imitation of nature, of character, of the passions and their operations in diversified situations.
    Horace Walpole (1717–1797)

    A sociosphere of contact, control, persuasion and dissuasion, of exhibitions of inhibitions in massive or homeopathic doses...: this is obscenity. All structures turned inside out and exhibited, all operations rendered visible. In America this goes all the way from the bewildering network of aerial telephone and electric wires ... to the concrete multiplication of all the bodily functions in the home, the litany of ingredients on the tiniest can of food, the exhibition of income or IQ.
    Jean Baudrillard (b. 1929)