Measurement On Effectiveness of Scheduling
The idea of dynamic priority scheduling is to confine focus on algorithms that assign priorities based on temporal parameters and maximize of resources utilization; This utilization measurement of a certain scheduling, called schedulable utilization, is scaled from 0 to 1, and the higher the schedulable utilization means the better algorithm. Every set of periodic tasks with total utilization less or equal than the schedulable utilization of an algorithm can be feasibly scheduled by that algorithm.
Read more about this topic: Dynamic Priority Scheduling
Famous quotes containing the word measurement:
“Thats the great danger of sectarian opinions, they always accept the formulas of past events as useful for the measurement of future events and they never are, if you have high standards of accuracy.”
—John Dos Passos (18961970)