The Southern Railway, formed in 1923, began an extensive programme of electrification of their suburban lines. The line from Waterloo to Dorking was electrified using the 660V third rail system in 1925 and regular half-hourly semi-fast services were introduced on 12 July 1925 to run seven days per week. The 22.5 mi (36.2 km) journey to Waterloo originally took 45 minutes, although this was considerably lengthened when trains began to stop at all stations shortly afterwards. An additional hourly electric service to London Bridge via Mitcham Junction and Tulse Hill began on 3 March 1929; the 25 mi (40 km) journey took 53 minutes. The mid-Sussex electrification of 1938 resulted in the express steam services from Victoria being replaced by electric services which were routed through Dorking. These gave commuters from Dorking their fastest ever link to Victoria (34 minutes during peak hours). In the timetable change of May 1978 the mid-Sussex express services were routed via Gatwick Airport and the off-peak service to Dorking was reduced to two semi-fast services from Victoria per hour, with services to Horsham running every two hours. Now the average journey time to London termini takes a passenger 55 minutes.

The service to Horsham was neglected for some years during the 1980s with a shuttle service between Dorking and Horsham operating every two hours at off peak times. The service now provided is one train an hour through from London to Horsham,(headcode 84). The off peak service of two trains from London Bridge to Horsham via Sutton and Dorking ran for a number of years from about 1985 but had ceased by 2000. The former Horsham to Waterloo via Dorking North trains (headcode 15) ceased as early as 1980.

Read more about this topic:  Dorking Railway Station