Don Mills LRT

The Don Mills LRT was a proposed light rail line in Toronto, Ontario, Canada. It was part of the Transit City proposal announced March 16, 2007, to be operated by the Toronto Transit Commission. It was expected to cost approximately $675 million, with construction to begin in 2012, and an expected opening in 2016. It would've been the fifth of the seven Transit City lines to be complete after the Sheppard East LRT, Etobicoke-Finch West LRT, Waterfront West LRT, and Eglinton Crosstown LRT lines.

Mayor Rob Ford cancelled the line after taking office in December 2010. However, this decision was never taken to City Council for approval. The line's status remains uncertain.

Read more about Don Mills LRT:  Route Layout, Potential Extensions, Proposed Stops/stations, Proposed Transit City LRT Lines

Famous quotes containing the word mills:

    The logical English train a scholar as they train an engineer. Oxford is Greek factory, as Wilton mills weave carpet, and Sheffield grinds steel. They know the use of a tutor, as they know the use of a horse; and they draw the greatest amount of benefit from both. The reading men are kept by hard walking, hard riding, and measured eating and drinking, at the top of their condition, and two days before the examination, do not work but lounge, ride, or run, to be fresh on the college doomsday.
    Ralph Waldo Emerson (1803–1882)