Delta IV - Vehicle Processing

Vehicle Processing

The Delta IVs are assembled using a process that Boeing claims reduces cost and expensive on-pad time. The CBCs are built in Boeing's factory in Decatur, Alabama. They are then loaded onto the M/V Delta Mariner, a roll-on/roll-off cargo vessel, and shipped to either launch pad. There, they are offloaded and rolled into a Horizontal Integration Facility (HIF), where they are mated with the second stages, which were shipped separately to the pad on the Delta Mariner. Also, in the HIF, the three CBCs of Heavy variant are mated to each other.

Various tests are performed, and then the vehicle is rolled horizontally to the pad, where the Fixed Pad Erector (FPE) is used to raise the vehicle to the vertical position, inside the MST. At this time, the GEM-60 solid motors, if any are required, are rolled to the pad and attached to the vehicle. After further testing, the payload (which has already been enclosed in its fairing) is transported to the pad, hoisted into the MST by a crane, and attached to the vehicle. Finally, on launch day, the MST is rolled away from the vehicle, and the vehicle is ready for launch.

Read more about this topic:  Delta IV

Famous quotes containing the word vehicle:

    In all Works of This, and of the Dramatic Kind, STORY, or AMUSEMENT, should be considered as little more than the Vehicle to the more necessary INSTRUCTION.
    Samuel Richardson (1689–1761)