On Monday, September 5, 2005, electrical power began to be restored to buildings in the central business district of New Orleans on a priority basis. By Thursday, September 8, Entergy had restored 9 of 17 electricity generating units in the New Orleans area to service. Entergy's 1000 MW Waterford and Watson plants were still out of service, with the Watson plant expected to require 6–12 weeks to repair. By Friday, electrical power had been restored to 11% of New Orleans customers. Also, officials were organizing to have work begin as soon as Monday, September 12, to rebuild the, "twin spans" I-10 bridge to New Orleans.

On Tuesday, September 6, 2005, the Port of New Orleans, the largest U.S. port in terms of tonnage handled, was able to receive and service relief ships. It was estimated that resumption of commercial shipments would take at least 14 days.

By Wednesday, September 7, 2005, safe drinking water was available in some West Bank areas, including Algiers and the Jefferson Parish suburbs, and some water pressure was available in New Orleans for fire fighting. All sewage from the city was flowing untreated into the Mississippi. The Lower Mississippi River was open during daylight hours to shallow draft traffic and deep draft vessels less than 39 feet (12 m). A contractor removed obstacles in the Southwest Pass, which was restricting deep draft navigation.

The Louis Armstrong New Orleans International Airport reopened on Monday, September 12, 2005, to cargo traffic, with limited passenger service expected to resume Tuesday, September 13, 2005.

Officials awarded a $30.9 million contract to repair the, "twin spans" I-10 bridge to New Orleans to Boh Brothers Construction Co. on September 12, 2005. It was estimated that 45 days would be required before the bridge could reopen to normal traffic. Water pressure had now been restored in the majority of the Jefferson Parish. A "boil water" order was still in force on the East Bank, but had been lifted for the West Bank. On the East Bank, 17% of sewage pumps were operational, and 39% were operational on the West Bank.

On Tuesday, September 13, 2005, the Mississippi River upstream of Head of Passes was declared open by the United States Coast Guard. The Head of Passes — 95 miles (153 km) downriver from New Orleans as measured from Algiers Point — is where the river branches off into separate passes into the Gulf. The only part of the river operating under any restrictions was from the main stem of the Mississippi River channel through Southwest Pass to the Gulf. That section was limited to daylight traffic. The Coast Guard continued restoring Aids to Navigation (AToN) to allow night transits, giving first priority to those AToNs described by pilots as being most critical.

The Gulf Intracoastal Waterway was opened from Texas to Florida using Baptiste Collette Bayou as an alternative to the IHNC. The GIWW reach from Baptiste Collette to Pascagoula was limited to 9.5' draft, versus the 12' authorized. Caution was recommended for transit.

The Inner Harbor Navigation Canal (IHNC) Lock became operational but was still not operating due to bridge closures and sunken barges, the removal of which was anticipated to take until mid-week.

The Mississippi River Gulf Outlet was closed to deep draft vessels. The inland portion was serving as an alternative route to the GIWW due to closure of the IHNC for shallow draft vessels. Preliminary surveys indicated a controlling depth of 27'.

Port Fourchon sustained significant damage, but was operating to a limited extent. Sunken vessels were not blocking the channel.

Tiger Pass was shoaled to less than 6'. This channel, authorized to 14' provides a shorter route for vessels traveling to the west from the Mississippi River near the mouth. Primarily used by fishing and supply vessels. Dredging was planned.

The Army Corps of Engineers conducted preliminary surveys for Atchafalaya, Houma, and other channels. NOAA continued its surveys of the Mississippi River to verify the Corps centerline survey results.

Read more about this topic:  Civil Engineering And Infrastructure Repair In New Orleans After Hurricane Katrina

Famous quotes containing the word repair:

    The United Nations cannot do anything, and never could; it is not an animate entity or agent. It is a place, a stage, a forum and a shrine ... a place to which powerful people can repair when they are fearful about the course on which their own rhetoric seems to be propelling them.
    Conor Cruise O’Brien (b. 1917)