Chennai Port - The Future

The Future

A third box terminal has been approved by the Cabinet Committee on Infrastructure. This will require investment of US$800 million and will be offered as a build-operate-transfer project, as part of a 30-year concession. Construction will take seven years to complete and the deep-water container terminal will have a capacity of 4 million TEU. The mega container terminal project, expected to be the single largest terminal ever built in India, is to be developed north of existing Bharathi Dock with two new breakwaters (total length of 4.23 km (2.63 mi)), continuous quay length of 2 km (1.2 mi) with 22 m (72 ft) alongside depth (ultimate) and a basin area of 300 hectares and back up area of 100 hectares. The gigantic proportions will feature 2 km quay length in a straight line at the new outer harbour, with a 2.75 km extension of the existing outer arm breakwater and a new northern breakwater of 1.73 km emanating from the eastern breakwater of the fishing harbour. The project also involves converting waterfront into 225 acres of land. The other side of breakwater would be used by the port as a berth to handle oil vessels. The project will be the first deep-water terminal of its kind in India and can handle ultra-large container ships of capacity over 15,000 TEUs and length of 400 m (1,300 ft). Overall project completion is expected by 2018. In September 2011, Mundra Port and Special Economic Zone Ltd (MPSEZ) emerged as the sole and lowest bidder for constructing the mega terminal. Based on earlier projections, Chennai is expected to handle 5 million TEUs by 2017.

Chennai Port Trust has plans to build a marina along a 200-metre (660 ft) stretch in the west quay to berth a dozen yachts. The marina will provide lockers, separate berths and other facilities to these sailors, who come in small boats. The sailors can then proceed inland for sightseeing. However, the plan still remains on paper. Although the plan to build a large-scale marina is at the proposal stage, the port cannot have a marina till the coal yard is vacated. After coal handling is moved out, the port will reclaim land by constructing groynes—rigid hydraulic structures built from an ocean shore that interrupt water flow and limit the movement of sediment.

The Rajiv Gandhi dry port (container freight station) and multi-modal logistics hub near Sriperumbudur special economic zone (SEZ) is under development at an estimated cost of 3,800 million, including land cost of 1,001.6 million. Proposed components include ICD/off-dock CFS, container yard, rail and road connectivity to national rail and road network, trade centre, warehouses for containerized cargos like leather garments, textiles, automotive components and electronic hardware. A total of 125 acres of land at Mappedu in the Sriperumbudur SEZ alloted by SIPCOT of the Government of Tamil Nadu is being acquired for the project on a 99-year lease basis. The first-of-its-kind project is expected to be completed by 2014. The distance between Chennai Port and the dry port is about 50 km (31 mi). About 19 km (12 mi) would be covered by the elevated corridor, 16 km (9.9 mi) by National Highway 4 and balance by a single-line state highway that would be converted into two-lane soon. The dry port would consist of 75 acres (30 ha) of custom-bound area and 50 acres (20 ha) of non-custom bound area and would accommodate containers, hazardous and non-hazardous materials. A barge jetty-cum-liquid cargo terminal at an outlay of 250 million is also being proposed on PPP mode. This is one of the three container freight stations planned by Chennai Port Trust.

A barge handling facility at the Bharathi Dock is being developed at a cost of 250 million. The project is expected to be completed by 2013. The 200 m long barge jetty is being developed with a depth of 10 m and back area of 7,500 m. The jetty is proposed to be constructed between the iron ore berth and oil terminal so as to cater to barges and bunkers and similar vessels handling liquid cargo.

The port is planning to construct a parking facility on an 11-acre stretch in Thiruvottiyur for container trucks. The port is also investing 500 million to have more berths exclusively for bunkering.

The port has decided to have a 7.5 MW wind energy farm in Tirunelveli district at an outlay of 493.1 million.

To reduce congestion at the harbour, which has two bays (two each for entry and two for exit of containers), the port plans to modernise zero gate and open one more bay and widen the roads that lead to zero gate and to lay six to eight lanes from the zero gate to avoid stranding of vehicles.

In December 2011, as part of security measures, the Directorate of Logistics, Customs and Central Excise planned to get a fixed mega container scanner within the next few months at a location near the Zero Gate of the port at a cost of 600 million from a U.S.-based company.

The Chennai Port Trust plans to develop a barge handling facility inside the port at a cost of 260 million in Bharathi Dock through public-private partnership to meet the increase in demand for bunkering - fuel oil used aboard ships. The need for barge facility is also due to the increasing vessel movements and vessel size. The proposed length of the jetty will be three times the length of the present facility. The jetty could accommodate barges with carrying capacity of 1,000 tonne to 3,000 tonne. In addition to bunkering fuel and edible oil, other cargoes that are envisaged to be handled at the proposed facility include vegetable oil (crude and refined), furnace oil and molasses.

Read more about this topic:  Chennai Port

Famous quotes containing the word future:

    Do not discourage your children from hoarding, if they have a taste to it; whoever lays up his penny rather than part with it for a cake, at least is not the slave of gross appetite; and shows besides a preference always to be esteemed, of the future to the present moment.
    Samuel Johnson (1709–1784)

    We simply must have faith in each other, faith in our ability to govern ourselves, and faith in the future of this Nation. Restoring that faith and that confidence to America is now the most important task we face.
    Jimmy Carter (James Earl Carter, Jr.)