Chennai Central - Connectivity

Connectivity

Chennai Central railway station is a hub for suburban trains. Suburban lines originating from Chennai Central include West North Line, North Line, and West Line. Chennai Park suburban station is in proximity to the station, thus facilitating connectivity to Tambaram/Chengalpet/Tirumalpur routes through South Line and South West Line. Chennai Central can be directly reached from all suburban stations and MRTS stations in and around Chennai (except Washermanpet and Royapuram) either through its own MMC Complex for suburban trains or through the nearby Park suburban station or the Park Town MRTS station. Currently, there is only one direct suburban train that plies from Chennai Beach Junction to Chennai Central via Washermanpet and Royapuram, and hence there is no frequent direct connectivity for these two stations to Chennai Central. The Chennai Park Town MRTS station is close to Chennai Central station.

Chennai Central is connected to the Chennai Mofussil Bus Terminus and other parts of the city by buses operated by the Metropolitan Transport Corporation, by means of separate bus lanes near the main entrance, close to the concourse. There are prepaid auto and taxi stands at the station premises. However, only 30 autorickshaws are presently attached to the prepaid counter parking, as Chennai Metro Rail has acquired its parking area for station construction.

The terminus is connected to the Park railway station and the Government General Hospital by two subways on either side. The two subways, which are one of the first in the city, are used by thousands of commuters day round. Nevertheless, jaywalking prevails as a substantial number of commuters prefer crossing the road, at times resulting in accidents.

The terminus is connected with the Egmore station, the other most important terminus of the city, by a circuitous and congested route covering a distance of 11.2 km via Chennai Beach. There was initially a proposal to connect the two termini by means of an elevated section with double-line broad-gauge electrified track with two elevated platforms at Chennai Central, at the cost of 930 million, which would cut the distance to 2.5 km. The project, approved on 8 April 2003 and initially aimed to be completed by 2005, was later scrapped owing to the expected rate of return on the project being only 1 to 2 percent, poor soil conditions on the Poonamallee High Road, and other issues.

Read more about this topic:  Chennai Central