Cape Wind - Approval Process

Approval Process

Because the proposed turbines are more than 3 miles (4.8 km) from shore, they are subject to federal jurisdiction. However, near-shore infrastructure including roads and power cables make the project subject to state and local jurisdiction as well. All necessary state and local pre-construction approvals were obtained by 2009. Major federal approvals were obtained May 17, 2010, with lease details, and construction and operation permits to be granted as the project proceeds.

Read more about this topic:  Cape Wind

Famous quotes containing the words approval and/or process:

    The final flat of the hoe’s approval stamp
    Is reserved for the bed of a few selected seed.
    Robert Frost (1874–1963)

    Like a prophet, you are possibly teaching us about the workings of the divine mind, but in the process you are ruining the human mind, dear friend.
    Franz Grillparzer (1791–1872)