British Rail Telecommunications - Asset Information

Asset Information

This section gives a brief insight into the origin of British Rail’s telecom assets and why they are in the condition they are today. In the late 1960s the National Telecoms Plan (NTP) was launched which brought about a centrally managed (BRHQ) project to install a nation-wide co-axial cable based 4 MHz system of transmission bearer services for voice and on-line real time data networks. This was completed in 1972.

The fixed network as we know it today was installed piecemeal as part of BR’s electrification and signalling projects between 1972 and 1993.

Fault reporting is localised and system failure is generally only uncovered as a consequence of customer complaint. The fixed telecommunications network consists of a wide variety of mostly old technologies, some of which are obsolete.

As a result of the privatisation process, a significant proportion of the fixed telecommunications network is now provided through lease agreements with Global Crossing and it is maintained by the former BRT.

Read more about this topic:  British Rail Telecommunications

Famous quotes containing the words asset and/or information:

    When ... did the word “temperament” come into fashion with us?... whatever it stands for, it long since became a great social asset for women, and a great social excuse for men. Perhaps it came in when we discovered that artists were human beings.
    Katharine Fullerton Gerould (1879–1944)

    I was brought up to believe that the only thing worth doing was to add to the sum of accurate information in the world.
    Margaret Mead (1901–1978)