Closure
On August 17, 2011 During an inspection a crack was found in the floor beam under the bridge deck, the bridge was closed. The bridge was reopened on August 23, 2011.
Read more about this topic: Black Hawk Bridge
Closure
On August 17, 2011 During an inspection a crack was found in the floor beam under the bridge deck, the bridge was closed. The bridge was reopened on August 23, 2011.
Read more about this topic: Black Hawk Bridge