Bell UH-1 Iroquois Variants - UH-1L

UH-1L

With deliveries of the UH-1E underway to the US Marines the US Navy tested a few and found that the type would suit their uses as a utility helicopter. On 16 May 1968, the US Navy ordered eight aircraft under the designation UH-1L.

The “Lima” Huey was basically a UH-1E, of the later production type based on the Army's UH-1C, equipped with a rescue hoist and intake particle screen. The “Ls” were delivered without the armour or armament installed and were equipped with the Lycoming T53-L-13 powerplant of 1,400 shp (1,000 kW).

The first four “Limas” were delivered in November 1969 and sent to Vietnam to equip the US Navy HA(L)-3 detachment assigned to Operation Sealords. In Vietnam the aircraft were modified with weapons and armour and were fitted to carry 500 lb (230 kg) bombs and 500 lb (230 kg) Fuel-Air Explosive munitions.

There was a TH-1L version of the UH-1L for the Navy to replace the H-34 and the borrowed Army UH-1Ds used in the training role, including for pilot aircraft carrier qualification training. Forty-five TH-1Ls were delivered starting in November 1969.

Read more about this topic:  Bell UH-1 Iroquois Variants