Future Expansion and Extension
Expansion projects for the Bay Area Rapid Transit have existed ever since the opening of the project. As well as the Oakland Airport connector, these projects include the Warm Springs extension, the San Jose extension, eBART, 'tBART': I-580/Tri-Valley Corridor, 'wBART': I-80/West Contra Costa Corridor, and numerous infill stations along the route.
On the Fremont line the Warm Springs extension is being built. It will be a precursor to Phase I of the San Jose extension that will begin construction in mid-2012, with stations at Milpitas and Berryessa. Heading east from Pittsburg/Bay Point, two additional stations are under construction and will be added to the system using a diesel multiple unit "eBART" train system with stations at Pittsburg and Antioch.
Read more about this topic: Bay Area Rapid Transit
Famous quotes containing the words future, expansion and/or extension:
“We simply must have faith in each other, faith in our ability to govern ourselves, and faith in the future of this Nation. Restoring that faith and that confidence to America is now the most important task we face.”
—Jimmy Carter (James Earl Carter, Jr.)
“The fundamental steps of expansion that will open a person, over time, to the full flowering of his or her individuality are the same for both genders. But men and women are rarely in the same place struggling with the same questions at the same age.”
—Gail Sheehy (20th century)
“Slavery is founded on the selfishness of mans natureopposition to it on his love of justice. These principles are in eternal antagonism; and when brought into collision so fiercely as slavery extension brings them, shocks and throes and convulsions must ceaselessly follow.”
—Abraham Lincoln (18091865)