Bansagar Canal Project
The Bansagar Canal Project was also started in 1978 and is likely to be completed in year 2008. Following Canal System, which will utilize water from the Bansagar Reservoir, are in progress as under:
Canal System | Length (km) | Annual irrigation (ha) |
---|---|---|
Common Water Carrier | 36.57 | No direct irrigation |
Right Bank Canal | 30.80 | 5059 |
Bhitari Canal | 11.20 | 2730 |
Sihawal Canal | 75.30 | 27143 |
Keoti canal | 90.00 | 45528 |
Purwa Canal | 128.90 | 74084 |
Gurh Mauganj Canal | 65.00 | 24654 |
Teonthar Lift Canal | 40.96 | 14161 |
Read more about this topic: Bansagar Dam
Famous quotes containing the words canal and/or project:
“My impression about the Panama Canal is that the great revolution it is going to introduce in the trade of the world is in the trade between the east and the west coast of the United States.”
—William Howard Taft (18571930)
“I wish to come to know you get to know you all
Let your belief in me and me in you stand tall
Just like a project of which no one tells
Or do ya still think that Im somebody else?”
—John Ashbery (b. 1927)