Bank Negara Komuter Station - Design

Design

As are other halts along KTM Komuter lines, the Bank Negara halt is lined along two electrified railway tracks, each with one of the halt's two side platforms at either side of the track. However, accommodating railway lines located along a small valley, the halt and its platforms were required to be crammed into a limited amount of space, with one ticketing concourse placed at one edge of the valley. The Bank Negara halt does not feature a centralised ticketing concourse, but was rather designed with two, each intended for either platform. Accordingly, the halt does not feature a footbridge in itself, instead relying on a road bridge outside the stop as a crossing over the railway tracks and between two platforms. Owing to its lack of importance managing other responsibilities along the railway other than Komuter services, the halt only houses ticketing facilities for Komuter trains, including ticket counters and ticket vending machines, fare gates, and a small staff.

Fare tickets can be bought with local currency using a combination of coins and notes at the vending machines, which automatically return change, or at the ticket counters. Currently, there are two ticketing areas - one on each side of the track. There are also dedicated fare gates that are operated with contactless value-stored cards as these are installed with the card readers. Unlike most halts and stations, commuters are not allowed to cross between the two sides, once passed the gates, without going through the fare gates again.

Renovation works to upgrade the halt began in April 2007. The new station will have a new concourse over the tracks and platforms. The new concourse will have a ticketing booth, ticket vending machines, prayer area and retail outlets. It will also have a common entrance to the two platforms where previously, they could only be accessed through separate gates. The new halt will also have lifts for passengers to access the platforms, making the halt disabled-friendly. The weather shelters will be replaced with a single high-cover over the entire waiting areas of both sides and over the tracks. The renovation works, which cost RM6 million, are expected to be completed by mid October 2007. The halt however continues to operate although certain areas have been closed off and the entrances relocated.

Generally, renovations have not been completed as of January 2008. The covered platforms are only about 90% completed. The areas nearer the new main lobby are not fully constructed yet - having only some support frames on both sides. In fact, it is observed that the entire roof of the main lobby has been redesigned. The original design structure (as per picture) was erected but after about 2 months, they were dismantled and in January 2008, a new roof structure was erected.

Read more about this topic:  Bank Negara Komuter Station

Famous quotes containing the word design:

    What but design of darkness to appall?—
    If design govern in a thing so small.
    Robert Frost (1874–1963)

    With wonderful art he grinds into paint for his picture all his moods and experiences, so that all his forces may be brought to the encounter. Apparently writing without a particular design or responsibility, setting down his soliloquies from time to time, taking advantage of all his humors, when at length the hour comes to declare himself, he puts down in plain English, without quotation marks, what he, Thomas Carlyle, is ready to defend in the face of the world.
    Henry David Thoreau (1817–1862)

    The reason American cars don’t sell anymore is that they have forgotten how to design the American Dream. What does it matter if you buy a car today or six months from now, because cars are not beautiful. That’s why the American auto industry is in trouble: no design, no desire.
    Karl Lagerfeld (b. 1938)