Australian Overland Telegraph Line - Construction

Construction

The South Australian Superintendent of Telegraphs, Charles Todd, was appointed head of the project, and devised a timetable to complete the immense project on schedule. Todd had built South Australia's first telegraph line and extended it to Melbourne. The contract stipulated a total cost of no more than ₤128,000 and two years' construction time. He divided the route into three regions: northern and southern sections to be handled by private contractors, and a central section which would be constructed by his own department. The telegraph line would comprise more than 30,000 wrought iron poles, insulators, batteries, wire and other equipment, ordered from England. The poles were placed 80 m apart and repeater stations built every 250 km.

Todd assembled a team of men from all walks of life: surveyors, linesmen, carpenters, labourers and cooks. The team left Adelaide with horses, bullocks and carts loaded with provisions and equipment for many weeks. The central section would be surveyed by the explorer John Ross. William Dalwood and Joseph Derwent arrived in Darwin on board the SS Omeo with eighty men and the equipment required to construct the Northern section of the line from Darwin to Tennant Creek. The southern section from Port Augusta to Alberga Creek was contracted to Edward Meade Bagot.

The northern line was progressing well until the onset of the wet season in November 1870. Heavy rain of up to 10 inches (250 mm) a day waterlogged the ground and made it impossible for work to progress. With conditions worsening, the men went on strike on 7 March 1871, rancid food and disease-spreading mosquitoes amongst their complaints. Weeks later the overseer, McMinn decided to rescind the contract for the northern section. The South Australian government was now forced to construct an extra 700 km of line, placing considerable stress on its teams. It was another six months before reinforcements led by engineer Robert Patterson arrived in Darwin.

As the central and southern sections neared completion, Patterson decided to take a different strategy with the construction of the northern section. It was divided into four sub-sections with the majority of the men on the most northerly section. If the construction deadline of 31 December was missed, then the gap could be filled by using a pony express. The undersea cable was finished earlier than expected, with the line from Java reaching Darwin on 18 November 1871 and being connected the following day.

Because of the problems still facing the northern section, the Queensland Superintendent of Telegraphs called for the abandonment of the project, but work went on nevertheless. By the end of the year there was still over 300 km of line to erect. During this time Todd began visiting workers along the line to lift their spirits. The message he sent along the incomplete line on 22 May 1872, took 9 days to reach Adelaide.

Read more about this topic:  Australian Overland Telegraph Line

Famous quotes containing the word construction:

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)