York Region Transit - Bus Rapid Transit

Bus Rapid Transit

In response to escalating congestion on the region's roads, York Region's transit plan included a provision for a bus rapid transit (BRT) system along the Yonge Street and Highway 7 arterial corridors. This service, known as Viva, was launched in September 2005.

Construction on Phase 2 began in 2009, with the construction of a bus-only roadway parallel to Enterprise Drive. Construction of bus-only lanes on Highway 7 began in 2010, and construction on Yonge Street is expected to be started 2012.


Read more about this topic:  York Region Transit

Famous quotes containing the words bus, rapid and/or transit:

    Literature transforms and intensifies ordinary language, deviates systematically from everyday speech. If you approach me at a bus stop and murmur “Thou still unravished bride of quietness,” then I am instantly aware that I am in the presence of the literary.
    Terry Eagleton (b. 1943)

    he dreadful darts
    With rapid glide along the leaning line;
    And, fixing in the wretch his cruel fangs
    James Thomson (1700–1748)

    There’s that popular misconception of man as something between a brute and an angel. Actually man is in transit between brute and God.
    Norman Mailer (b. 1923)