Worth Way - National Cycle Network

National Cycle Network

In Summer 1999 the trail was resurfaced using a combination of natural materials to enable it to become part of the Sustrans National Cycle Network. Lasting eight weeks, the work was carried out by contractors Edburtons who laid a 2.5m wide path which would accommodate walkers, cyclists and horseriders. The works cost £300,000 and were jointly funded by West Sussex County Council, Mid Sussex County Council and the National Lottery Millennium Fund; the telecommunications company Eurobell also contributed funds in return for the right to lay cables under the path. The works coincided with the completion of final section of the Worth Way between Station Hill near Three Bridges station, as well as a new link with another trail, the Forest Way, at Herontye Drive in East Grinstead which follows the remaining section of the Three Bridges to Tunbridge Wells Central Line as far as Groombridge.

Both the Worth Way and the Forest Way, together with a third disused railway footpath - the Cuckoo Trail, form part of Route 21 of the National Cycle Network linking London, Reigate and Gatwick Airport with East Grinstead, Heathfield and Eastbourne.

Read more about this topic:  Worth Way

Famous quotes containing the words national, cycle and/or network:

    National isolation breeds national neurosis.
    Hubert H. Humphrey (1911–1978)

    Only mediocrities progress. An artist revolves in a cycle of masterpieces, the first of which is no less perfect than the last.
    Oscar Wilde (1854–1900)

    A culture may be conceived as a network of beliefs and purposes in which any string in the net pulls and is pulled by the others, thus perpetually changing the configuration of the whole. If the cultural element called morals takes on a new shape, we must ask what other strings have pulled it out of line. It cannot be one solitary string, nor even the strings nearby, for the network is three-dimensional at least.
    Jacques Barzun (b. 1907)