Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“O dearly-bought revenge, yet glorious!
Living or dying thou hast fulfilld
The work for which thou wast foretold
To Israel, and now lyst victorious
Among thy slain self-killd
Not willingly, but tangld in the fold
Of dire necessity”
—John Milton (16081674)
“... whats been building since the 1980s is a new kind of social Darwinism that blames poverty and crime and the crisis of our youth on a breakdown of the family. Thats what will last after this flurry on family values.”
—Stephanie Coontz (b. 1944)
“Vashtar: So its finished. A structure to house one man and the greatest treasure of all time.
Senta: And a structure that will last for all time.
Vashtar: Only history will tell that.
Senta: Sire, will he not be remembered?
Vashtar: Yes, hell be remembered. The pyramidll keep his memory alive. In that he built better than he knew.”
—William Faulkner (18971962)