Work Breakdown Structure

Work Breakdown Structure

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.

A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

Read more about Work Breakdown Structure:  Overview, History, Example, Misconceptions

Famous quotes containing the words work, breakdown and/or structure:

    O dearly-bought revenge, yet glorious!
    Living or dying thou hast fulfill’d
    The work for which thou wast foretold
    To Israel, and now ly’st victorious
    Among thy slain self-kill’d
    Not willingly, but tangl’d in the fold
    Of dire necessity
    John Milton (1608–1674)

    ... what’s been building since the 1980’s is a new kind of social Darwinism that blames poverty and crime and the crisis of our youth on a breakdown of the family. That’s what will last after this flurry on family values.
    Stephanie Coontz (b. 1944)

    Vashtar: So it’s finished. A structure to house one man and the greatest treasure of all time.
    Senta: And a structure that will last for all time.
    Vashtar: Only history will tell that.
    Senta: Sire, will he not be remembered?
    Vashtar: Yes, he’ll be remembered. The pyramid’ll keep his memory alive. In that he built better than he knew.
    William Faulkner (1897–1962)