Wine Cave - Wine Cave Construction

Wine Cave Construction

The challenge for the design and construction of most wine caves is to create a fairly wide span in weak rock with low cover. The size of a typical wine barrel storage cave is 13 to 18 ft (4 to 5.5 m) wide and 10 to 13 ft (3 to 4 m) high. Constructed caves, however, range up to 85 ft (30 m) in width and 50 ft (15 m) in height; difficult to achieve in poor quality rock.

In areas of complex geology, good portal sites are hard to find. A typical wine cave is constructed with two or more portal sites, for safety and operational reasons. At least one portal leads directly outside, but in many cases at least one portal makes a direct connection to a winery building.

Most portals into the wine caves have rock/soil overburden heights less than 0.2 times their entrance heights and widths. The height of the portal face normally ranges from 12 to 20 ft (3.5 to 6 m). The portal areas are seldom stripped of the loose soil material and the portals are cut from the native ground surface using excavators. The side slopes of the portal are often laid back to 0.5H:1V or steeper, and the portal face is excavated to vertical or near vertical.

The construction of cave interiors can be complicated by the elaborate curves and labyrinth-style floor plans selected by some owners for their wine caves. As the ground surface slopes upward, providing more cover and usually sounder rock, caves can accommodate multiple drifts. Where possible, the cave is designed and constructed to provide at least 1.2 times their width of cover at intersections. Room and pillar layouts, similar to underground mine design, provide an economical construction arrangement. Tunnel legs are usually 30 to 100 ft (9 to 30 m) in length and pillars are typically a minimum of 20 ft (6 m) wide.

On most occasions, the New Austrian Tunneling Method (single or multiple face), also known now as Sequential Excavation Method (SEM), with minor innovative technology advances, is used to excavate and support wine caves.

The caves are typically excavated in an inverted horseshoe shape with a crown radius and with straight or curved legs. The tunnels are usually excavated using a tunnel roadheader or a milling head attachment on an excavator. The spoils behind the roadheader conveyor belt are dumped on the invert and mucked out using a rubber-tired skid loader or a load-haul-dump (LHD) mining machine.

Initially, the excavation advance is likely to be limited to 2 ft (0.6 m) without initial ground support. Once turned under, and depending on ground conditions, the unsupported advance may be increased to 4 ft (1.2 m), 6 ft (1.8 m), and longer increments. The maximum advance without initial ground support may reach 20 ft (6 m) or more in stable volcanic ash tuff. In sheared serpentinite, deeply weathered lava rock or wet clayey ground, however, unstable ground conditions may limit the unsupported advance to less than 2 ft (0.6 m).

Shotcrete reinforcement and ground support is utilized at the tunnel portals and in the interior of the wine caves. At the portals, soil nail and shotcrete walls are typically used for permanent support and are constructed from the top down in lifts. Soil nails are installed 4 to 6 ft (1.2 to 1.8 m) apart in the horizontal and vertical directions. The shotcrete is typically a minimum of 6 inches (15 cm) thick and reinforced with welded wire fabric. The typical 4,000 psi (28 MPa) design strength mix is applied using the wet process.

Within the caves, the initial ground support is usually fiber-reinforced shotcrete. A minimum of 2 inches (5 cm) thickness of wet mix shotcrete is applied around the exposed ground perimeter following each day’s advance. As cave dimensions and ground conditions require, additional layers of shotcrete and welded wire fabric follow on subsequent days. The shotcrete mix is a 4,000 psi (28 MPa) compressive strength design. In some cases, pattern or spot rock bolts are also installed. Where wider and taller halls are used, modeling is employed to assist with the liner design.

Interior finishing of the caves is an integral part of the construction process. Waterproofing details are important for the interiors of wine caves. Wet spots and water seeps are unsightly, and can cause maintenance and safety problems. Moisture vapor migration through the cave liner, however, is desirable to maintain humidity.

Most contractors install prefabrication drainage strips at regular intervals between the native ground and the shotcrete liner. The drain strips relieve the hydrostatic pressure, but have little effect on wet spots and water seeps. Xypex has been used for many years to mitigate seepage, either as a shotcrete admixture or spray applied, with relatively good success. Where excessive groundwater is present, membranes placed between successive shotcrete layers have been used. Many new products, including admixtures and membranes, are being evaluated and tested to improve moisture conditions. The wine cave industry in Northern California is at the forefront of waterproofing technology implementation.

After the cave complex has been completely excavated, waterproofed, and initially supported, a 2 inches (5 cm) thickness of final shotcrete or plain/colored gunite is applied to the walls and arch. Utility conduits and piping are encased within the final layer of shotcrete in the walls and arch and placed under the concrete floor slab. Reinforced concrete slabs are usually 6 in. (15 cm) thick and are underlain by subdrain.

To support their varied uses, wine cave complexes may contain as many as 13 different utility systems. These include systems for hot and cold domestic water and processing water, electric power, lighting, sound and water features, battery emergency power, compressed gas systems, communications and radio relays, automatic ventilation, and computerized sensors and climate controls.

Read more about this topic:  Wine Cave

Famous quotes containing the words wine, cave and/or construction:

    Who gives to Aristaeus honey;
    Or wine to Bacchus, or Triptolemus
    Earth’s fruits, or apples to Alcinous?
    Ovid (Publius Ovidius Naso)

    If the sea were ink
    For the words of my Lord,
    the sea would be spent before the Words of my Lord are spent.
    —Qur’An. The Cave 18:109, ed. Arthur J. Arberry (1955)

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)