Development Process
Because WMI abstracts the manageable entities with CIM and a collection of providers, the development of a provider implies several steps. The major steps can be summarized as follows:
Step 1 – Create the manageable entity model
- Define a model
- Implement the model
Step 2 – Create the WMI Provider
- Determine the provider type to implement
- Determine the hosting model of the provider
- Create the provider template with the ATL wizard
- Implement the code logic in the provider
- Register the provider with WMI and the system
Step 3 – Test the provider
Step 4 – Create consumer sample code
Read more about this topic: Windows Management Instrumentation
Famous quotes containing the words development and/or process:
“The development of civilization and industry in general has always shown itself so active in the destruction of forests that everything that has been done for their conservation and production is completely insignificant in comparison.”
—Karl Marx (18181883)
“There was only one catch and that was Catch-22, which specified that a concern for ones own safety in the face of dangers that were real and immediate was the process of a rational mind.... Orr would be crazy to fly more missions and sane if he didnt, but if he was sane he had to fly them. If he flew them he was crazy and didnt have to; but if he didnt want to he was sane and had to.”
—Joseph Heller (b. 1923)