Wind Power in Morocco - Completed

Completed

  1. Tanger - Tanger Farm (140 MW - 165 turbines (?) - 2009)
  2. Tanger - Dhar Sadane Farm (75 MW - 126 turbines - 2009)
  3. Essaouira - YNNA Bio Power (20 MW - - 2009)
  4. Tangier - Sendouk Farm (65 MW - )
  5. Essaouira - Amogdoul Farm (65 MW - 2007)
  6. Tanger-Tetouan (Koudia Al Baida) - Abdelkhalek Torrès Farm (50 MW - 84 turbines - 2000)
  7. Tetouan - Lafarge Wind Farm (32 MW - 2005)

Read more about this topic:  Wind Power In Morocco

Famous quotes containing the word completed:

    Your letter is come; it came indeed twelve lines ago, but I
    could not stop to acknowledge it before, & I am glad it did not
    arrive till I had completed my first sentence, because the
    sentence had been made since yesterday, & I think forms a very
    good beginning.
    Jane Austen (1775–1817)

    Never is a historic deed already completed when it is done but always only when it is handed down to posterity. What we call “history” by no means represents the sum total of all significant deeds.... World history ... only comprises that tiny lighted sector which chanced to be placed in the spotlight by poetic or scholarly depictions.
    Stefan Zweig (18811942)

    A great biography should, like the close of a great drama, leave behind it a feeling of serenity. We collect into a small bunch the flowers, the few flowers, which brought sweetness into a life, and present it as an offering to an accomplished destiny. It is the dying refrain of a completed song, the final verse of a finished poem.
    André Maurois (1885–1967)