White Rose Centre - Construction

Construction

The site comprises 76 acres (310,000 m2) of land and was formerly the home of Morley Sewage works. Before building work could begin on-site in 1995, enabling works were carried out. This included removing the existing sewage works, sealing any disused mine shafts, removing contaminated soil and profiling the sloping site. This exercise required the movement of 750,000 cubic metres of soil to smooth out a 30 metre fall across the site and create a series of level terraces for the building and car parks. Work commenced on the 87-week project on 10 July 1995 and by September the first steelwork was visible. 600 semi-mature, 7 metre high trees were pre-purchased from Germany and planted in the car park areas to provide effective landscaping. In total, 5,000 trees and shrubs have been planted around the car parks and perimeter roads to further enrich the external design.

Read more about this topic:  White Rose Centre

Famous quotes containing the word construction:

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)