Welland Recreational Waterway - Changes

Changes

Some changes have been made to the Waterway's original shape since the construction of the By-Pass. The most significant modification is an earth plug that bisects the Waterway along Ontario Highway 58A (between Humberstone Road and Townline Tunnel Road). This was necessary due to very long (4 km, or 2.5 miles) low-grade approaches to the Townline Tunnel required for trains to travel underneath the new canal segment.

As multiple leaking problems were surfacing with the aqueduct that carries the Welland River underneath the old alignment, it was decided to control the problem by drilling intentional holes in the aqueduct. As a result, the Welland River downstream of the aqueduct is partially fed from the canal, and the flow in the northern section of the Waterway has reversed to compensate for the water flowing into the river.

The old alignment was originally spanned by five vertical lift bridges and a railroad swing bridge (bridge 15). After the relocation, two of the bridges were replaced by modern fixed-span bridges and another had its towers removed due to excessive cost of potential renovation. Two more bridges were built in the northern section of the Waterway, and a bridge was constructed in downtown Welland to twin the East Main Street bridge.

Read more about this topic:  Welland Recreational Waterway