Water Resources Development Act of 1988 - Navigation

Navigation

Authorized construction of the breakwaters to a greater height at the project at King Harbor, Redondo Beach, California, if recommended in a report of the Chief of Engineers.

Modified the navigation project for Los Angeles and Long Beach Harbors, San Pedro Bay, California, to provide that if non-Federal interests carry out any work associated with such project which is later recommended by the Chief of Engineers and approved by the Secretary, the Secretary may reimburse such non-Federal interests an amount equal to the Federal share of the costs, without interest.

Modified the navigation project at Annapolis Harbor, Maryland, to realign the channel in such project to promote more efficient mooring operations.

Authorized paying for the remaining cost for the navigation project for Deal Island, Maryland (Lower Thorofare).

Modified the navigation project at Gulfport Harbor, Mississippi, to alter the methods by which the Secretary, during construction of the project, may carry out a demonstration program to evaluate the costs and benefits of thin layer disposal in the Mississippi Sount of dredged material. Directed, during construction of the project, a demonstration program to evaluate the costs and benefits of thin layer disposal in the Mississippi Sound of dredged material from construction harbor improvements and to determine whether there are unacceptable adverse effects from such disposal. Required a report to the Congress and the Environmental Protection Agency (EPA) within one year of completion of the demonstration program. Provides for the EPA to approve or disapprove the report. Required a study team to assist in planning, carrying out, monitoring, and reporting on the program.

Increased the ceiling costs for the navigation project for the Blair and Sitcum Waterways, Washington.

Directed the study and report on cost recovery options and alternative methods of financing navigational improvements on the Great Lakes connecting channels and Saint Lawrence Seaway, including modernization of the Eisenhower and Snell Locks of the Saint Lawrence Seaway.

Authorized emergency repairs as necessary to preserve the existing dike at the Small Boat Harbor, Buffalo Harbor, New York, at a specified cost.

Directed maintenance of water levels in the Mississippi River headwaters reservoirs at specified limits.

Amended the Water Resources Development Act of 1986 to declare certain portions of the Delaware River in Philadelphia County, Pennsylvania, as nonnavigable.

Declared as nonnavigable certain portions of Coney Island Creek and Gravesend Bay, New York, and specified bodies of water in Ridgefield, New Jersey, as nonnavigable.

Declared that the following navigation projects shall remain authorized after December 31, 1989: (1) Monterey Harbor, California; (2) the north branch of the Chicago River, Illinois; (3) certain elements of the Missouri River Basin project; and (4) James River, Virginia.

Read more about this topic:  Water Resources Development Act Of 1988