In 1980 Syria unilaterally started a programme of dam building along the Yarmouk.

The southern slopes of Mount Hermon (Jebel esh-Sheikh) as well as the Golan Heights, were unilaterally annexed by Israel in 1981.

1988 The Syrian/Jordanian agreement on development of the Yarmouk is blocked when Israel as a riparian right holder refuses to ratify the plan and the World Bank withholds funding. Israel's augments its Johnson plan allocation of 25,000,000 m³/yr by a further 45,000,000–75,000,000 m³/yr.

The water agreement forms a part of the broader political treaty which was signed between Israel and Jordan in 1994, and the articles relating to water in this agreement do not correspond with Jordan’s rights to water as they were originally claimed. The nature and significance of the wider 1994 treaty meant that the water aspect was forced to cede importance and priority in negotiations, giving way to areas such as borders and security in terms of armed force, which were perceived by decision-makers as being the most integral issues to the settlement. Main points from the water sharing in the Jordan/Israel Peace treaty.

Jordan being a country that borders on the Jordan has riparian rights to water from the Jordan basin and upper Jordan tributaries. Due to the water diversion projects the flow to the river Jordan has been reduced from 1,300 million–1,500 million cubic metres to 250 million–300 million cubic metres. Where the water quality has been further reduced as the flow of the river Jordan is made of run-off from agricultural irrigation and saline springs.

Israel's subsequent developments have been mainly aimed at enlarging the main distribution system of Israel, run-off interception, reclamation of waste-water, and increasing the operational efficiency of water distribution networks. Over the year, the irrigated area within Israel has increased from 28,000 ha in 1948 to some 220,000 ha in 1997.

Problems can be seen to have emerged in 1999, when the treaty’s limitations were revealed by events concerning water shortages in the Jordan basin. A reduced supply of water to Israel due to drought meant that, in turn, Israel which is responsible for providing water to Jordan, decreased its water provisions to the country, provoking a diplomatic disagreement between the two and bringing the water component of the treaty back into question.

Israel's complaints that the reduction in water from the tributaries to the river Jordan caused by the Jordan/Syrian dam look to go unheeded due to the conflict of interest between Israel and her neighbours.

Read more about this topic:  Water Politics In The Jordan River Basin

Famous quotes containing the words subsequent and/or developments:

    Children of the same family, the same blood, with the same first associations and habits, have some means of enjoyment in their power, which no subsequent connections can supply; and it must be by a long and unnatural estrangement, by a divorce which no subsequent connection can justify, if such precious remains of the earliest attachments are ever entirely outlived.
    Jane Austen (1775–1817)

    The developments in the North were those loosely embraced in the term modernization and included urbanization, industrialization, and mechanization. While those changes went forward apace, the antebellum South changed comparatively little, clinging to its rural, agricultural, labor-intensive economy and its traditional folk culture.
    C. Vann Woodward (b. 1908)