Cost
In May 2005, the federal government, which owns the land, announced it was cutting rent costs by 54%. The rent reductions will cut the cost of the lease by approximately $840 million CAD between 2006–2020, or $5.0 billion CAD over the term of the lease, which ends in 2052. Currently, the airport authority pays about $80 million CAD each year in rent.
Passengers traveling through YVR are no longer required to pay a separate Airport Improvement Fee; it now is included in the price of a ticket.
Read more about this topic: Vancouver International Airport
Famous quotes containing the word cost:
“Every new stroke of civilization has cost the lives of countless brave men, who have fallen defeated by the dragon, in their efforts to win the apples of the Hesperides, or the fleece of gold. Fallen in their efforts to overcome the old, half sordid savagery of the lower stages of creation, and win the next stage.”
—D.H. (David Herbert)
“It may cost me twenty thousand francs; but for twenty thousand francs, I will have the right to rail against the iniquity of humanity, and to devote to it my eternal hatred.”
—Molière [Jean Baptiste Poquelin] (16221673)
“The President has paid dear for his White House. It has commonly cost him all his peace, and the best of his manly attributes. To preserve for a short time so conspicuous an appearance before the world, he is content to eat dust before the real masters who stand erect behind the throne.”
—Ralph Waldo Emerson (18031882)