Cost
In May 2005, the federal government, which owns the land, announced it was cutting rent costs by 54%. The rent reductions will cut the cost of the lease by approximately $840 million CAD between 2006–2020, or $5.0 billion CAD over the term of the lease, which ends in 2052. Currently, the airport authority pays about $80 million CAD each year in rent.
Passengers traveling through YVR are no longer required to pay a separate Airport Improvement Fee; it now is included in the price of a ticket.
Read more about this topic: Vancouver International Airport
Famous quotes containing the word cost:
“Greeting people doesnt cost you anything except a roll of your tongue.”
—Chinese proverb.
“One must always be aware, to noticeeven though the cost of noticing is to become responsible.”
—Thylias Moss, African American poet. As quoted in the Wall Street Journal (May 12, 1994)
“Mining today is an affair of mathematics, of finance, of the latest in engineering skill. Cautious men behind polished desks in San Francisco figure out in advance the amount of metal to a cubic yard, the number of yards washed a day, the cost of each operation. They have no need of grubstakes.”
—Merle Colby, U.S. public relief program (1935-1943)