Vale of Glamorgan Line - Reopening To Passengers

Reopening To Passengers

A pressure group called Railfuture produced a booklet “Rails to the Vale” in 1997 in which it was stated that they believe: that a new daily passenger service through the vale could cover its costs – and even generate profits given time

With traffic increasing to Cardiff International Airport, the Local Government transport consortium SWIFT also identified the potential for reopening the Vale of Glamorgan line. The scheme was promoted by the Vale of Glamorgan and Bridgend Borough Councils to the Welsh Assembly Government in August 1999. After agreeing funding, track upgrading and signalling works commenced in June 2004 with: 3.5 miles (5.6 km) of new track laid; 6.5 miles (10.5 km) of track upgraded; 15000 tonnes of ballast used; three new section signals (2 on the up and 1 on the down) were installed together with three distant signals and one repeater signal required by the curved approach to Llantwit Major Station. Final planning permission for the new stations and interchanges at Rhoose, Cardiff International Airport and Llantwit Major was granted in 2004 and from October 2004 the line was closed daily between Bridgend and Aberthaw or Barry for the station construction, with goods traffic passing at night. At Bridgend, the Barry bay was relaid and a new platform face built. Network Rail used three contractors: Mowlem for the permanent way; Carillion for signals and telephones; and Galliford Try for civil engineering, including the platforms. The Vale of Glamorgan Council was responsible for the construction of the interchanges at Rhoose, Cardiff International Airport and Llantwit Major. Network Rail spent £15m and the Vale of Glamorgan Council £2m making a grand total of £17m for the whole project. The daytime closures were shortened from April to enable crew training to commence.

The official opening was performed by Andrew Davies AM, Welsh Assembly Government Minister for Economic Development and Transport, on 10 June 2005. The section of line between Barry and Bridgend reopened for passenger services on 12 June, the first day of that year's Summer timetable, with 143606/624 working 0840 Cardiff-Bridgend and 0945 return. Arriva Trains Wales then ran a number of loco-hauled special services in conjunction with the Barry (waterfront) transport festival.

Read more about this topic:  Vale Of Glamorgan Line