USS Taussig (DD-746) - Initial Operations

Initial Operations

Taussig fitted out at the New York Navy Yard and conducted a five-week shakedown cruise near Bermuda before returning to New York on 13 July for post-shakedown availability. Repairs complete, she got underway on 18 August for more training — this time at Casco Bay, Maine. On 25 August, Taussig headed south from Boston and, on 1 September, transited the Panama Canal. From there, she headed north for a one-day stop at San Diego before continuing west to Pearl Harbor. After six days of training in Hawaiian waters, the warship cleared Pearl Harbor on 28 September in company with Destroyer Squadron 61 (DesRon 61) bound, via Eniwetok, for Ulithi. She entered the lagoon at Ulithi on 19 October and reported for duty with the 3rd Fleet.

Read more about this topic:  USS Taussig (DD-746)

Famous quotes containing the words initial and/or operations:

    Capital is a result of labor, and is used by labor to assist it in further production. Labor is the active and initial force, and labor is therefore the employer of capital.
    Henry George (1839–1897)

    It may seem strange that any road through such a wilderness should be passable, even in winter, when the snow is three or four feet deep, but at that season, wherever lumbering operations are actively carried on, teams are continually passing on the single track, and it becomes as smooth almost as a railway.
    Henry David Thoreau (1817–1862)