USS Springfield (CL-66) - Construction and Commissioning

Construction and Commissioning

Springfield was laid down on 13 February 1943 by Bethlehem Steel Corp. at its Fore River yard, Quincy, Mass.; launched on 9 March 1944; co-sponsored by Mrs. Angelina Bertera and Miss Norma McCurley; and commissioned on 9 September 1944 at Boston, Mass., Capt. Felix L. Johnson in command.

On 7 November, the light cruiser headed out of Boston harbor on her maiden voyage. Two days later, she put in at Norfolk, Va.; and, after several days of gunnery practice in the Chesapeake Bay, she started south for the British West Indies. The ship arrived in the Gulf of Paria, Trinidad, on the 21st and conducted shakedown training in that area during the following month. Springfield completed her shakedown training on 21 December and sailed back to Boston.

Read more about this topic:  USS Springfield (CL-66)

Famous quotes containing the word construction:

    “There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
    —John Dewey (1859–1952)