USS Pargo (SSN-650) - Construction and Commissioning

Construction and Commissioning

The contract to build Pargo was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 26 March 1963 and her keel was laid down there on 3 June 1964. She was launched on 17 September 1966, sponsored by Mrs. James L. Holloway, Jr., the wife of retired Admiral James L. Holloway, Jr. (1898–1984), and commissioned on 5 January 1968 with Commander Steven A. White in command.

Read more about this topic:  USS Pargo (SSN-650)

Famous quotes containing the word construction:

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)